Granitas Building — Big 5 Global Dubai Stand
A 64 m² stand turning heavy natural stone samples into architecture — a flawless Dubai operation with 12 tonnes of material.
- Fair
- Big 5 Global
- Venue
- Dubai World Trade Centre
- Location
- Dubai, UAE
- Year
- 2025
- Stand Area
- 64 m²
- Industry
- Construction & Building
Challenge
Granitas' product was heavy and fragile: large-format natural stone slabs. The brief asked for the product itself to become the architecture — demanding structural calculation, a dedicated support system and precision logistics.
Clearing a 12-tonne shipment through Dubai customs on the fair's schedule was the riskiest link in the chain.
Solution
A concealed steel frame carried the slabs like facade cladding, backlit to dramatise the veining. The structural dossier passed DWTC approval first time.
Freight ran combined sea + road, customs managed via ATA carnet and pre-declaration. Materials arrived three days before build-up; the stand was handed over on schedule.
Project Scope
- Structural engineering and steel frame
- Stone cladding mount system
- Combined sea+road logistics
- DWTC approvals and installation